Projects · CPEC priority project
A gateway zone between Port Qasim and the National Highway: 1,530 acres in Thatta District, planned for light, medium and heavy industry and developed as a public–private partnership.

- acres in the master plan
- 1,530
- plots planned
- 1,250
- of the land for industry
- 73%
- public–private partnership
- PPP
01Overview
Project overview
The Government of Sindh has allotted 1,530 acres of land to be developed as Dhabeji Special Economic Zone (DSEZ) in Thatta. It is a priority project under the China-Pakistan Economic Corridor (CPEC), to help investors from China and other countries start new enterprises or move their facilities to Pakistan.
The zone is being developed under a public–private partnership. SEZMC’s development guidelines give priority to export-oriented industries and encourage joint ventures with Pakistani companies.
Sources: sezmc.gos.pk; SEZMC projects presentation; SEZMC’s earlier website (guidelines).
02Connectivity
Distances as published by SEZMC, drawn on rings by distance. The diagram is schematic: directions are indicative and not to scale.
Schematic. Rings by distance on a logarithmic scale; directions indicative.
- 1 National Highway N-5 Direct access to the National Trade Corridor, upcountry and on to Central Asia. Earlier SEZMC website 0.5km
- 2 Dhabeji Railway Station, ML-1 On Main Line 1, marked on SEZMC’s site plan. SEZMC presentation 9.5km
- 3 Landhi Industrial Area Karachi’s eastern industrial belt. Earlier SEZMC website 20km
- 4 Port Qasim Raw materials in and finished goods out without long inland haulage. Earlier SEZMC website 22km
- 5 Karachi Airport Via the National Highway, for visiting managers and foreign staff. sezmc.gos.pk 35km
- 6 Karachi–Hyderabad Motorway M-9 The motorway north to Hyderabad and the rest of the country. Earlier SEZMC website 35km
- 7 Thatta District headquarters. Earlier SEZMC website 40km
- 8 Hyderabad Sindh’s second-largest city. Earlier SEZMC website 140km
- 9 Gwadar Deep-sea port on the CPEC route to the west. Earlier SEZMC website 700km
SEZMC’s presentation also marks a creek side with the possibility of a jetty, a proposed interchange on the National Highway, and a direct access road to Port Qasim (planned).
03Project enablers
The enabling projects listed in SEZMC’s presentation, with the estimated cost and the target date it gave. A target date is not a confirmed completion; SEZMC will publish current status here.
-
E-01
Electricity
250 MW
Dedicated 220 kV grid
-
E-02
Gas
13.5 MMCFD
Gas supply to the zone
-
E-03
Water
10 MGD
Dedicated water line
-
E-04
Access road
Port link
Direct road connecting Port Qasim with the zone
04Master plan
The master plan
Zoom into the master plan as supplied to SEZMC. The land-use figures are read from the plan’s own table; select a use to see its share.
1,250 plots · 1,530.1 acres (plan total)
| Land use | Plots | Acres | Share |
|---|---|---|---|
| Heavy industry | 115 | 405.1 | 26.5% |
| Medium industry | 304 | 347.1 | 22.7% |
| Light industry | 494 | 275.5 | 18.0% |
| Warehouse / medium industry | 24 | 89.0 | 5.8% |
| Commercial, expo centre, hotel | 268 | 48.5 | 3.2% |
| Residential | 11 | 14.6 | 1.0% |
| Amenities Fire station and emergency response centre, health facility, parks and masjid, police station, ICT building, Dhabeji Walk, green belt | – | 27.2 | 1.8% |
| Utilities Water works, desalination plant, sewage treatment plant, garbage collection point, gas chamber | – | 14.7 | 1.0% |
| Roads 12 m to 60 m wide | – | 291.6 | 19.1% |
As listed in the plan’s table; the rows do not add up exactly to the plan total.
05Industry
Focused sectors
The industries SEZMC has named for Dhabeji, grouped by scale of production and energy use.
Light industry
- L01Garments (cut and stitching units)
- L02Textiles value addition
- L03Consumer electronics assembly (e.g. mobile phones, semiconductors)
- L04Pharmaceutical packaging and formulation
- L05Food processing and packaging
Medium industry
- M01Automobile manufacturing (electric vehicles)
- M02Auto parts (lithium batteries etc.)
- M03Agricultural equipment assembly
- M04Furniture manufacturing
- M05Cold chain and refrigeration equipment
- M06Solar plates, inverters and parts manufacturing
Heavy industry
- H01Steel fabrication
- H02Chemical manufacturing (e.g. industrial chemicals, paints)
- H03Machinery and equipment manufacturing
- H04Large-scale textile processing units
- H05Construction materials (prefabricated structures)
06Photographs
On the ground
Visits, signings and site work recorded by SEZMC, in the order the photographs were taken.
-
15 July 2023 Groundbreaking ceremony Photograph: SEZMC shared drive, events -
2024 Event on the zone site Photograph: SEZMC media gallery, sezmc.gos.pk -
December 2024 Delegation on site Photograph: SEZMC media gallery, sezmc.gos.pk -
December 2024 Reviewing the site plan Photograph: SEZMC media gallery, sezmc.gos.pk -
December 2024 Delegation at the DSEZ site Photograph: SEZMC media gallery, sezmc.gos.pk -
January 2025 Memorandum of understanding signed Photograph: SEZMC media gallery, sezmc.gos.pk -
July 2025 Visitors on site Photograph: SEZMC media gallery, sezmc.gos.pk -
July 2025 Meeting at the site office Photograph: SEZMC media gallery, sezmc.gos.pk -
July 2025 Buildings under construction Photograph: SEZMC media gallery, sezmc.gos.pk
Tell SEZMC’s Investor Desk what you plan to build, the land and utilities you need and your timeline.